top of page

All enclosure and controls needed to be removed in order to modify and strengthen the bed of the machine to allow for U-drive installation.
Machine fully disassembled including all mechanical components for the index drive unit to allow access under the machine for the fabrication work to install u-drive.


U-drive ready for test fit on site.
Machine bed and frame cut out ready for fabrication work on frame and installation of Box.


Quick mock up to make sure everything fits and the transfer of cans will be seamless when the machine is running.
U-drive unit installed and ready for infeed belt to be fitted.

bottom of page